Search results

1 – 3 of 3
Article
Publication date: 7 November 2016

Efthimia Pantzartzis, Lipika Deka, Andrew D.F. Price, Chris Tann, Grant R.W. Mills and Sameedha Rich-Mahadkar

Lord Carter’s (2015) “Review of Operational Productivity in NHS providers” stated that to improve National Health Service (NHS) England’s efficiency, operational productivity…

Abstract

Purpose

Lord Carter’s (2015) “Review of Operational Productivity in NHS providers” stated that to improve National Health Service (NHS) England’s efficiency, operational productivity should be targeted in four main areas, one being estates management. NHS England’s estate includes a variety of buildings some of which are considered no longer fit-for-purpose, thus creating risk to patients and staff. These built assets require continuous maintenance, adding pressures to NHS England’s precarious financial situation. The purpose of this paper is to identify positive strategies and major constraints to achieving sustainable management of backlog maintenance (BM) across the NHS assets, and thus suggest balanced actions.

Design/methodology/approach

The research adopts a qualitative approach and combines: literature review of current BM methodologies; interviews with estates and facilities directors from seven NHS trusts on BM strategies; and a NHS trust detailed case study.

Findings

The major finding is that sustainable management of BM is achievable if there is a consistent, pro-active and long-term strategic approach where critical levels of BM are prioritised. Additional issues (i.e. appropriate methodology, performance metrics and links with clinical service delivery strategies) also need to be considered.

Practical implications

This study is relevant to the management of the NHS estate including development and adoption of sustainable strategies.

Originality/value

This paper offers original insights to the factors influencing healthcare estates’ BM at a time when the UK policy agenda is targeting infrastructure operational efficiency and organisations are seeking more comprehensive methodologies.

Details

Built Environment Project and Asset Management, vol. 6 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 16 November 2012

Sameedha Mahadkar, Grant Mills and Andrew D.F. Price

With the advent of the Darzi review in 2008, and more recently the White Paper “Equity and Excellence: Liberating the NHS” (2010), the NHS in England is being redesigned to…

1728

Abstract

Purpose

With the advent of the Darzi review in 2008, and more recently the White Paper “Equity and Excellence: Liberating the NHS” (2010), the NHS in England is being redesigned to provide high quality, person‐centred services with improved capacity and performance. In this change oriented scenario, stakeholder consultation has a critical role to play given the widespread advocacy in government policy and healthcare literature. In order to support informed decision making, the purpose of this paper is to: explore healthcare infrastructure planning through various approaches to stakeholder consultation within English Primary Care Trusts (PCTs); and develop a conceptual approach to strategic asset management (SAM) based on the findings of stakeholder consultation and engagement exercises.

Design/methodology/approach

A multi‐method triangulation approach including action research has been adopted to evaluate current stakeholder consultation practices with a local PCT and to explore their approach to healthcare infrastructure planning through: a literature review of stakeholder engagement and theory; evaluation of a local consultation exercise; and a web based document review of consultation practices within 149 English PCTs.

Findings

PCT estate managers and healthcare planners have to operate within constantly changing dynamic healthcare environments and need to reduce uncertainty and indecision that often surrounds the debate of reconfiguration of healthcare facilities and services. Consultations by the PCTs vary in: the level of detail provided to the public; sample sizes; detail and transparency of the consultation; distribution and analyses of the consultation; and techniques and approaches.

Practical implications

The findings of this study can be used by healthcare policy makers to: inform how clinical commissioning groups (CCGs) could be better involved during patient and public engagement; and determine practical ways of putting patients at the heart of General Practitioners (GP) commissioning.

Originality/value

The research identifies gaps within current stakeholder consultation practices in English PCTs and develops a conceptual approach to SAM that accounts for stakeholder consultation; decision making levels within healthcare infrastructure planning within a wider competency based organisational view, which currently does not exist.

Details

Built Environment Project and Asset Management, vol. 2 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Content available
Article
Publication date: 28 January 2014

Robert C. Guyer

367

Abstract

Details

Built Environment Project and Asset Management, vol. 4 no. 1
Type: Research Article
ISSN: 2044-124X

1 – 3 of 3